Membrane Roof

Godown Roof Membrane Waterproofing, Karjat

Karjat · February 2024

The project

Godown Roof Membrane Waterproofing, Karjat

An 8,000 sq ft godown roof that had leaked for two years, sealed in 8 days with 3 mm STP membrane and a 5-year warranty.

This godown in Karjat had been leaking for two years. Water was coming in through the roof hooks and the joints between the roof sheets.

We primed the whole roof with one coat of oil-based primer, then torch-applied 3 mm STP membrane directly over the corrugated sheets, sealing every hook and joint along the way. Around 80 rolls of membrane covered the full 8,000 sq ft.

A two-person crew completed the work in 8 days. The roof was water-tested before handover and is covered by a 5-year written warranty. Nearly three years on, the client is happy with it.

Location
Karjat
Completed
February 2024
Category
Membrane Roof
Client
Godown (warehouse)
Area
8,000 sq ft
Services
Primer coat, torch-applied membrane over sheet roof, hook and joint sealing
Materials
Oil-based primer, STP 3 mm membrane (80 rolls)